70. You are loading in a port subject to the tropical load line mark and bound for a port subject to the winter load line mark. You will enter the summer zone after steaming one and one-half days, and you will enter the winter zone after a total of six days. You will consume 29 tons of fuel, water, and stores per day. The hydrometer reading at the loading pier is 1.006, and the average TPI is 43. What is the minimum freeboard required at the start of the voyage? Reference Table BL-0008 below.

70. You are loading in a port subject to the tropical load line mark and bound for a port subject to the winter load line mark. You will enter the summer zone after steaming one and one-half days, and you will enter the winter zone after a total of six days. You will consume 29 tons of fuel, water, and stores per day. The hydrometer reading at the loading pier is 1.006, and the average TPI is 43. What is the minimum freeboard required at the start of the voyage? Reference Table BL-0008 below.

Comments (0)

There are no comments at the moment. If you found an error or think question is incorrect, tell everyone about it