4553. You are loading in a port subject to the winter load line mark and bound for a port subject to the tropical load line mark. You will enter the summer zone after steaming four days, and you will enter the tropical zone after a total of twelve days. You will consume 31 tons of fuel, water, and stores per day. The hydrometer reading at the loading pier is 1.000, and the average TPI is 46. What is the minimum freeboard required at the start of the voyage? Reference Table BL-0013 below.

4553. You are loading in a port subject to the winter load line mark and bound for a port subject to the tropical load line mark. You will enter the summer zone after steaming four days, and you will enter the tropical zone after a total of twelve days. You will consume 31 tons of fuel, water, and stores per day. The hydrometer reading at the loading pier is 1.000, and the average TPI is 46. What is the minimum freeboard required at the start of the voyage? Reference Table BL-0013 below.

Comments (0)

There are no comments at the moment. If you found an error or think question is incorrect, tell everyone about it

Progress: 24% (23/94)?

Learning progress ?
4551 4552 4553 4554 4555 4556 4557 4558 4559 4560 4561 4562 4563 4564 4565 4566 4567 4568 4569 4570 4571 4572 4573 4574 4575
183/221