1046. How much additional solid weight could be loaded at a VCG of 189.7 feet on the DEEP DRILLER while loaded as shown in the Sample Load Form #4 (Drilling)? Assume ballast added or discharged to maintain draft is done so at 15 feet above the baseline.

Comments (0)

There are no comments at the moment. If you found an error or think question is incorrect, tell everyone about it

Progress: 24% (23/94)?

Learning progress ?
1026 1027 1028 1029 1030 1031 1032 1033 1034 1035 1036 1037 1038 1039 1040 1041 1042 1043 1044 1045 1046 1047 1048 1049 1050
42/87